Nine-Room Rooming House Budget: The $748,000 Build Price Is Not the Project Total

Yan Zhu

Yan Zhu

Co-Founder & Chief Data Officer

An adviser’s desk with an architectural model and separated budget folders

AI-generated editorial illustration; not a photograph of a property or project discussed here.

General information only — not personal financial, tax, credit, or legal advice

PremiumRea Pty Ltd is a licensed Victorian real-estate buyer's agency. We are not a licensed financial adviser, tax agent, credit provider, mortgage broker, or lawyer, and nothing on this website is personal financial product advice, tax advice, credit advice, or legal advice. Information is general in nature and has been prepared without taking into account your objectives, financial situation, or needs. Before acting on anything you read here, consider whether it is appropriate for your circumstances and obtain independent professional advice from suitably licensed advisers.

See our full disclaimer and terms of use.

Use the published price accurately

A nine-room rooming house budget starts with the published build price and then tests everything around it. E2ES and DollarBuild, our sister construction companies, publish the Victorian build price of their nine-bedroom, nine-ensuite rooming house as $748,000 including GST — $680,000 plus 10% GST — in a price book dated 17 October 2026.12 The design has a 292.05 m² drawing area including the porch and 2.4 m ceilings. Victoria is the only state with a published rooming house price.

DollarBuild describes the price as turnkey including paperwork, states that the agreed contract price stays fixed through the build for the agreed scope, and itemises the site-specific items — demolition of an existing house, service connections, ground conditions and access — in the written proposal for the address.2 This is the builders’ published offer, not an independent market average or a completed-project cost study. Attach the address-specific design, inclusions and contract to it, and do not reinterpret a build price as the cost of acquiring land and owning the investment. Whether the land suits the brief is covered in our site-selection checklist.

Disclosure: E2ES, DollarBuild and OptimaRea are sister companies of PremiumRea under common ownership. We do not receive a referral commission on these links.

Create one ledger with clear boundaries

Start with a total-project ledger and give every line an owner. The building contract is reconciled against the published scope and the written proposal for the address. The acquisition ledger separately holds the purchase, transaction costs and financing. If an item appears in the construction scope, do not add it again as a generic development allowance.

If an item remains unclear, label it “confirmation required” and resolve it in writing; that is different from presenting it as an exclusion. This discipline prevents both an understated budget and a pessimistic one inflated by duplicated allowances, and lets competing proposals be compared on the same deliverable rather than their headline prices.

Distinguish project cost from cash required

Five ledgers answer five different questions:

  • Contracted build — what construction the agreed price buys, with the itemised site items.
  • Acquisition and transaction — the land or property, duty, legal and inspection costs.
  • Finance and holding — interest, fees, rates and insurance over the real programme.
  • Opening and operating reserve — the cash that carries licensing, registration, furnishing decisions and early vacancies.
  • GST and other tax treatment — what is payable, recoverable or otherwise treated for this buyer.

Total project cost is not the buyer’s equity contribution. Loan proceeds are funding, not income, and principal repayments use cash without being an operating expense. Put deposits, progress claims and settlement on dates, so an apparently sufficient total does not hide a temporary shortfall.

Calculate acquisition duty from the transaction

The State Revenue Office assesses land transfer duty on the dutiable value, which is the greater of the price paid and the market value.3 Use the actual transaction and the buyer’s circumstances. Do not apply a guessed flat rate, and do not assume a concession because the building will provide housing.

The SRO calculator is an estimate with stated exclusions.4 Give the contract and ownership structure to the conveyancer or tax adviser, include legal and acquisition costs once, keep a source beside each figure, and recalculate when the price or the purchaser changes.

Do not deduct a GST credit by assumption

The ATO treats rent from residential premises as input taxed, and GST credits are generally not available for costs that relate to input-taxed supplies. It treats the lease of commercial residential premises, which include boarding houses or similar, as subject to GST.5 Which side a rooming house falls on depends on the premises and how they operate, which is the subject of the ATO’s ruling on commercial residential premises; the Victorian planning label “rooming house” does not settle it.6

So budget the $748,000 GST-inclusive figure as the cash number until your tax adviser documents the treatment for this owner, operator and use, including any split between an owning and an operating entity. A favourable tax assumption should never be the only reason an otherwise unaffordable acquisition looks feasible.

Budget for the risks the contract price does not cover

Victoria’s Home Warranty scheme does not apply to domestic building work on a Class 1b or Class 3 building.7 A purpose-built nine-room rooming house is designed as Class 1b, so plan the project without that statutory backstop: check the builder’s registration and financial capacity, match progress payments to verified stages, and have your own construction lawyer review the contract before signing. Because the builders are related to PremiumRea, independent legal advice matters more, not less.

The operator also needs a Business Licensing Authority licence before operating, and each rooming house must be registered with the local council.8 Put the time and cost of those steps, the minimum-standards fit-out and an opening reserve in the operating ledger rather than inside the construction figure.

Test time as well as the final total

The builders publish a programme of 4 weeks of paperwork followed by 3 months of construction, with the scope, site requirements and schedule agreed before signing; where a lot needs a planning permit, that approval time is confirmed in writing at feasibility.2 Settlement, demolition, the building permit, the occupancy permit, council registration and lease-up are separate dates around that programme. Put every one on a dated cash schedule and ask when each payment falls due and when the lender releases funds.

Do not insert a lease-up duration that nobody has committed to. Model a reserve for vacancies and repairs separately from construction; our nine-room vacancy model separates scheduled rent from collected cash, and the approval sequence lists the gates in order. The rooming house lending guide covers how lenders treat the asset.

Set the purchase ceiling using the reconciled budget

A practical equation is: maximum affordable purchase price = available project funding minus every other confirmed project cash requirement, with duty and funding costs recalculated as the price changes. That is a funding ceiling, not a valuation, and the investment must still meet the buyer’s operating and exit requirements — read the exit-strategy guide before treating a future sale as the balancing figure.

PremiumRea uses the reconciled budget in its acquisition service to screen candidate properties.

"The build price is the most certain number in the model, which is exactly why it cannot carry the rest," says Yan Zhu, Co-Founder & Chief Data Officer at PremiumRea. "Land, duty, tax treatment and time each need their own evidence before the offer."

Frequently asked questions

Is the published nine-room build price $748,000 including GST?

Yes. The Victorian price book dated 17 October 2026 lists $680,000 plus GST, which is $748,000 including 10% GST.

Does the build price include the land?

No. The build price covers the agreed construction scope. The land or property, duty, finance and holding costs sit in separate ledgers.

Can I claim the GST on the build back?

Do not assume so. Residential rent is input taxed, while commercial residential premises are taxable; your adviser must assess the premises, the operation and your structure before any credit enters the cash model.

Does Home Warranty cover a nine-room rooming house build?

No. The Victorian Home Warranty scheme does not apply to domestic building work on a Class 1b or Class 3 building, so check the builder, stage the payments and take independent legal advice.

Who handles this for a buyer

PremiumRea is a Melbourne buyers agent — Premium REA Pty Ltd, holding company real-estate agent licences in Victoria, New South Wales and Queensland. We find, assess and negotiate home and investment purchases for one flat fee of $15,800 + GST, and the 345 documented purchases we settled between January 2023 and September 2025 are published as an open dataset. The questions this article works through are the ones we settle on a specific property before a client makes an offer.

References

  1. [1]E2ES: published state build prices, including the Victorian 300 m² Rooming House at $748,000 including GST (price book dated 17 October 2026); checked 14 November 2026
  2. [2]DollarBuild: Rooming House 300 — nine bedrooms, nine ensuites, 292.05 m² drawing area, published Victorian build price, inclusions, programme, delivery method and acquisition screen; checked 14 November 2026
  3. [3]State Revenue Office Victoria, Understanding the dutiable value of a property — duty is assessed on the greater of the price paid and the market value; checked 14 November 2026
  4. [4]State Revenue Office Victoria, Land transfer duty calculator — an estimate with stated exclusions; checked 14 November 2026
  5. [5]Australian Taxation Office, GST and residential property — rent from residential premises is input taxed; the lease of commercial residential premises, which include boarding houses or similar, is subject to GST (page last updated 14 May 2025); checked 14 November 2026
  6. [6]Australian Taxation Office, GSTR 2012/6 Goods and services tax: commercial residential premises — classification depends on the premises and how they operate; obtain transaction-specific advice; checked 14 November 2026
  7. [7]Building (Statutory Insurance Scheme) Regulations 2026 (Vic), regulation 9(c) — the Home Warranty scheme does not apply to domestic building work on a Class 1b or Class 3 building; checked 20 October 2026
  8. [8]Consumer Affairs Victoria, Rooming house operators licensing scheme — the operator must be granted a licence before operating; registering each rooming house with the local council is a separate obligation; checked 14 November 2026

About the author

Yan Zhu

Yan Zhu

Co-Founder & Chief Data Officer

Former actuary turned property strategist, Yan brings rigorous data analysis and policy expertise to help investors make better decisions.